FCC 26-80: a Part 90 certification path for jammers

On 19 November 2026 the FCC adopted FCC 26-80, a Third Report and Order and Fourth Further Notice of Proposed Rulemaking in GN Docket No. 13-111, released on 20 November. It allows departments of corrections, and the solutions providers they contract with, to operate radio frequency jamming solutions inside correctional facilities, under a licence or a spectrum lease. For equipment makers the order creates something new: a certification route for jamming devices, under a new Part 90 subpart Z, with its own power limits, a geofencing lock, restricted marketing and a mandatory physical warning label. Jammers cannot be certified under Part 15, and a modular transmitter cannot be certified as a jamming device.

In short:

  • Certification: every jamming device used in a jamming solution must be certified under Part 90 through the Part 2 subpart J procedures, whatever commercial band it targets (para. 199, new § 90.1431).
  • Excluded routes: no Part 15 operation or certification, even at Part 15 power levels (para. 196 and 200, new § 15.5(e) and § 15.201(e)), and no modular certification (§ 90.1431(a)).
  • Technical limits: 18 dBm/MHz EIRP below 1 GHz and 24 dBm/MHz EIRP above 1 GHz, the out-of-band emission limits of the targeted service, downlink only in FDD bands, and a geofencing feature that shuts the device down outside the licensed area (§ 90.1419 to § 90.1429).
  • Marketing and label: sales only to a department of corrections or a contracted solutions provider (§ 90.1433), and a warning on the device and its packaging that cannot be an e-label (§ 90.1435).
  • Timing: the rules take effect 30 days after publication in the Federal Register, except the sections with information collections, including the label, which wait for OMB approval (para. 279). Publication had not happened on 22 November 2026.

Section 333 of the Communications Act prohibits deliberate or malicious interference with authorized radio communications, and the Commission recalls that it had previously treated non-federal jamming in prisons as prohibited (para. 2). FCC 26-80 changes the approach: it withdraws subscriber authority to operate contraband wireless devices in correctional facilities where a jamming solution is authorized, through a revised § 1.903(c), and then licenses the jamming itself (para. 6). Two routes are available: a non-exclusive Part 90 overlay licence, or a Part 1 spectrum lease agreed with the wireless provider (para. 6 and 10).

The order defines a jamming device as "a transmitter within a correctional facility that prevents a contraband wireless device from establishing or maintaining a radio link by overwhelming the contraband wireless device with RF energy", and states that it "does not provide information to or communicate with a contraband wireless device" (para. 11). That last element separates it from the contraband interdiction systems (CIS) already authorized, such as managed access systems.

Before a licence, an eligible entity must pass a proof of concept test at a correctional facility under a Part 5 experimental licence (§ 90.1407). After the licence and before operation, it must pass an on-site test "using jamming devices that have obtained equipment authorization under part 2" and file the FCC IDs (§ 90.1411(a)).

The vote was not unanimous: Commissioner Gomez approved in part and dissented in part.

Point What FCC 26-80 adopts Where
Procedure Certification, the Part 2 subpart J route with a TCB, under Part 90 only, not under each commercial service rule part Para. 199, § 90.1431
Part 15 Jamming devices may not operate under Part 15 and are not eligible for Part 15 certification Para. 196 and 200, § 15.5(e), § 15.201(e)
Modules "A modular transmitter may not be certified as a jamming device" Para. 200, § 90.1431(a)
Application Sections 2.911 and 2.1033 apply unchanged Para. 202
Covered List Covered List equipment is not eligible and cannot be used in a jamming solution Para. 202, § 2.903
PAG Jamming devices go on the pre-approval guidance procedure until the Commission considers them mature Para. 202, § 2.964, KDB 388624
RF exposure Sections 1.1307, 2.1091 and 2.1093 apply; the application must state compliance for fundamental and unwanted emissions Para. 193
Testing before a grant Only under a Part 5 experimental licence (§ 2.805(b)) Para. 204
Import before a grant Allowed under § 2.1204(a)(3), up to 4,000 units for testing, evaluation and development Para. 211
Made in USA Not required Para. 212
Public list OET will publish a list of authorized jamming equipment "at the appropriate time" Para. 199

The Commission explains the Part 15 and modular exclusions by the same aim: preventing "the proliferation of unlicensed low-power, hand-held jamming devices" and stopping an approved module from being built into equipment unrelated to a jamming solution without its own authorization (para. 200).

Requirement Value or obligation Rule
Bands A closed list of commercial bands from 617 MHz to 4140 MHz, plus the UMFUS bands of § 30.4 § 90.1405
Power below 1 GHz 18 dBm/MHz EIRP maximum radiated PSD § 90.1419(a)(1)
Power above 1 GHz 24 dBm/MHz EIRP maximum radiated PSD § 90.1419(a)(2)
Measurement Peak or average; average measurements limited to a peak-to-average ratio of 13 dB § 90.1419(c)
Out-of-band emissions The limits of the targeted service (§ 27.53, § 22.917, § 24.238, § 96.41, § 30.203, § 90.543(e) and others), which may be applied at the outer edges when several adjacent blocks or services are jammed § 90.1421
FDD bands Downlink only § 90.1429
Locking Geofencing that makes the device cease operating if removed from the licensed containment area, plus a location feature § 90.1423
Monitoring Monitor the RF environment, detect a material change in a carrier's signal level, and adapt automatically or stop jamming in that band § 90.1425

The power figures are ceilings: § 90.1419(b) requires "the minimum power necessary", and the order expects many correctional facility environments to need substantially less (para. 169).

Jamming devices remain subject to § 2.803, which generally limits marketing before equipment authorization, and § 90.1433 adds that they "may only be marketed" to a department of corrections for use at a correctional facility, or to a solutions provider under contract with one. Because marketing includes sale, a department or provider can only resell to another eligible entity (para. 207).

Manufacturers, distributors and retailers must put this advisory on the outside packaging and on a label permanently affixed to the device (§ 90.1435):

WARNING: This is NOT a CONSUMER device. You can ONLY PURCHASE AND/OR OPERATE this device if you have an FCC LICENSE authorizing the operation of a jamming solution in a correctional facility

The information may not be given through the electronic labelling of § 2.935 (para. 209). Section 90.1435 is one of the sections that wait for OMB approval before taking effect (para. 279).

The order takes effect 30 days after its publication in the Federal Register. Sections 1.949(e)(5), 1.9041(c), (d), (e), (k), (m)(1) and (n), 20.23(c), 90.1407, 90.1409, 90.1411, 90.1417, 90.1427, 90.1435 and 90.1437 contain information collections and take effect only once the FCC announces OMB approval in the Federal Register (para. 279). The equipment authorization, power, emission, geofencing and marketing sections (§ 90.1419 to § 90.1425, § 90.1429 to § 90.1433) are not on that list.

The Fourth Further Notice proposes extending the framework to unlicensed Part 15 operations such as Wi-Fi, and seeks comment on jamming satellite communications, on coordination duties for wireless providers, on further safeguards and on "quiet zones" around correctional facilities (para. 224). Comments are due 60 days, and replies 90 days, after Federal Register publication. Any extension to Part 15 bands would be a separate decision.

  1. If you build jamming equipment for correctional facilities, plan a Part 90 certification through a TCB, expect a PAG inquiry, and design for the PSD limits, the out-of-band limits of each targeted band, FDD downlink-only operation and the geofencing lock.
  2. Do not design jamming hardware as a module or for Part 15: neither route can lead to a grant.
  3. Use a Part 5 experimental licence for any testing before the grant, and the § 2.1204(a)(3) import allowance for pre-grant units.
  4. Prepare the physical label and the packaging advisory now, so they are ready when § 90.1435 takes effect.
  5. Set up sales controls that limit buyers, and any resale, to departments of corrections and their contracted providers.
  6. Watch the Federal Register for the publication date that starts the 30-day clock and the 60 and 90-day comment periods, and for the OMB notice.

Sources & references

  1. FCC 26-80, Promoting Technological Solutions to Combat Contraband Wireless Device Use in Correctional Facilities, Third Report and Order and Fourth Further Notice of Proposed Rulemaking, GN Docket No. 13-111 (adopted 19 November 2026, released 20 November 2026), Federal Communications Commission docs.fcc.gov/public/attachments/FCC-26-80A1.pdf